|
1
Compressions in the surface layer
2
Holes
3 Accumulations of material (including
additives)
4 The working depth can be adjusted
to the exact centimeter– important in case
of ground surfaces that have been applied on top
of an easily scratched bitumen or synthetic grid
layer, etc. |
|
5 The teeth really „stir up“
the ground, intermixing and loosening the surface
layer (the dividing layer and Sub-assembly
are not affected)
6
Leveling of holes, accumulations,
hoof
prints, etc.
7 Additional
pulverization, homogenization
and leveling of the loosened surface layer
8 Here: Dividing layer of
modern gridded
sheeting 9 Sub-assembly |